Product(s) in Shortlist

Moore College handover and official opening in early 2017

Moore College handover and official opening in early 2017
Construction works at the new Moore College building at 1 King Street Newtown NSW have been completed, and the building is preparing to welcome students and staff in early 2017.

Congratulations to Class Electrical on a great job of installing 3S Extruded luminaires and down lights throughout the building.
Lighting Design: S4B Sydney
Principal Contractor: Kane Constructions
Electrical and Lighting Installations: Class Electrical
3S Luminaires: 805570.000 and various recessed downlights

You might also like these articles

4 lighting projects with perfect colour
4 lighting projects with perfect colour
5 minute read
3S Lighting and Xicato share four standout projects where the best LED technology helped get those colours just right.
Introducing the Xicato Intelligent Drivers (XID)
Introducing the Xicato Intelligent Drivers (XID)
5 minute read
For lighting designers who want a single, open standard, wireless control solution for a wide variety of LED light sources, Xicato introduces the Xicato intelligent drive controller (XID). XID provide...
RZB Product Highlight - TWINDOT EN
RZB Product Highlight - TWINDOT EN
2 minute read
video
2017 IES NSW and International Awards
2017 IES NSW and International Awards
2 minute read
3S Lighting has been recognised in all categories last Friday at the 2017 IES NSW and International Awards in Sydney.